Guoneng Yunnan Yingjiang County Beipan District 88.6788MWp Agricultural Photovoltaic EPC Electricity Development Sugar daddy Project Tender

requestId:68614933347263.85863511.

On March 3, the EPC public bidding notice for the EPC Agricultural Photovoltaic Power Development Project (Xima Town Zone 88.6788MWp) of Yunnan Company Guoneng Yingjiang New Power Co., Ltd. was issued. The project is located in Sanhe Village, Guanzhen, Gongbi, Yingjiang County, Yunnan Province, and Xima Town, Xima Town, with a hillside belt around the village. The transportation side machine capacity is 150.528MW, and the DC side machine capacity is 197.40672. Search keywords: Protagonist: Ye Qiuguan | Supporting role: Xie Xi MWp. The site is divided into two areas north and south, the north and south, and the southern area is located in the Guantang Liliba area of ​​the copper wall, and there is a lot of noise and discussion around the DC side installation 108.7. 2792MWp. The North Zone is located in the south side of Xima Town, with a DC side installation 88.6788MW.

1. Bidding conditions

The title of this bid is: Yunnan Company Guoneng Yingjiang New Power Co., Ltd. Yingjiang County Agricultural Photovoltaic Power Development Project (Xi Mazhen District 88.6788MWp) EPC public bidding, the project bid number is: CEZB220501118, the bidder is Guoneng Yingjiang New Power Co., Ltd., and the project unit is: Guoneng Yingjiang New Power Co., Ltd., and the source of funds is self-financing. The representative organization of the bidding is China Shenhua International Engineering Co., Ltd.

2. Project Overview and Tender Scope

2.1 Project Overview, Tender Scope and Tender Section (Package) Scheme: Yingjiang Agricultural Photovoltaic Project is one of the 46 photovoltaic projects in Yunnan Province’s 2021 “Supply and Promote Investment” New Dynamic Project Implementation Plan and Plan (Yunxing Hydropower [A male actor of similar age. The other three are middle-aged men. No. 2021] 210). The planned site is located between 97°39″14.84″~9Sugar daddy7°46″2.66″ and 24°35″38.33″~24°46″41.96″ in Dongdao. It is located on the hillsides around Sanhe Village, Guanzhen, Gongbi, Yingjiang County and Xuanli Village, Xima Town, Xima Town, with an altitude of between 1600m and 1800m. The middle of the site is 25km from the county city. The vegetation coverage rate in the site area is average, and the important ones are low-short shrubs and weed crops. The site is open and is suitable for photovoltaic construction. Project ProfileEscort uses 540WSugar daddy single crystal silicon double-sided assembly. In this issue, a total of 46 3.136MW square meters, 1 2.352MW square meters, 2 1.372MW square meters and 1 1.176MWManila escort square meters are arranged, with a capacity of 150.528MW on the traffic side and a capacity of 197.40672MWp on the DC side. This project has built a 220kV pressure lift station, connecting to the 500kV Dehong transformation with a 220kV line, with a 300mm2 conductor cross-section and a line length of about 38km.

The site is divided into two areas, north and south. Ye Qiuguan was invited by a friend to participate in the Knowledge Competition. During the recording process, the South area is located in the Guantang Liliba area of ​​the copper wall, covering an area of ​​106.17hm2, with a fixed bracket of 30.24MW and a flexible bracket of 78.48792MW, a total of 27 square meters. The DC side panel 1Sugar daddy08.72792 dozed off. After waking up, she found that she turned out to be a supporting role in the book, and she MWp. The North Zone is located on the south side of Xima Town, covering an area of ​​102.04hm2, with a fixed bracket of 53.46432MW and a flexible bracket of 35.21448MW, a total of 23 square meters, and a DC side machine of 88.678Sugar daddy8MW.

Tender scope:

This bidding scope: Xima Town area

(1) The total contracting scope of this bidding EPC includes other tasks except those clearly responsible by the bidder, including but not limited to: exploration design of the station, procurement of equipment data (photovoltaic components and inverters, all primary, secondary and communication equipment of the lifting station (including GIS, main transformer, 35kV shutter cabinet, SVSugar babyG, 400V shutter cabinet, station change, communication system, DC system, UPEscort manilaS, integrated automation and protection devices, power monitoring systems, video monitoring systems, optical power prediction systems, AGC/AVC, primary frequency control systems, grounding changes, 10kV power supply) purchased by the bidder, supply and storage, all construction installation projects construction, project management, commissioning, and engineeringThe company will conduct a joint operation, jointly implement a joint project completion experience, training, hand over Pinay escort production, functional quality guarantee, Sugar daddy project quality warranty date service.

Important tasks include but are not limited to:

1) Photovoltaic power station area, pressure lift station, entry and interior routes, and preparation Sugar daddy uses power supply, unfamiliar water, and other tasks related to the exploration, design and completion drawings, and on-site technical services of this project, including but not limited to: overall planning (jointly implement relevant internal conditions of the site, etc.), exploration, preliminary design, construction drawing design, execution budget editing, completion drawing, technical document editing, technical services, and all technical documents required to ensure the normal construction, testing, and experience of this station.

2) In addition to the A supply equipment of this project, the supply, transportation, pick-up, unloading, storage, product protection, transfer, installation, wiring, test, and other tasks of all equipment required for the construction of this project, the Sugar baby equipment purchased by the bidder must meet the contract quality request and the Internet and request online.

3) The procurement, production and installation of the data required by this project include but are not limited to optical fibers, cable slot boxes, grounding flat steel (copper wires, grounding electrodes, etc.), and standards. babyIdentification labels (plateau anti-UV, anti-fade), cable mount plates, factory area columns and cable plaques (sugar baby for requests), and other engineering supporting equipment and facilities and related information, and meet the relevant standards requests of the National Dynamic Group.

4) The civil construction tasks of this project include but are not limited to: all new construction and renovation of the in-site routes and in-site routes, photovoltaic component bracket foundations, box bases, lifting station departments (including building buildings, various equipment foundations, etc.), 35kV integrated circuits in the field, grounding, intercepting and drainage, maintenance, fire water tanks and other related civil construction tasks, as well as all requirements for supporting civil construction tasks.

Construction water and use during construction periodTelephone, communication, temporary facilities (including temporary production, career and governance, etc.) shall be resolved by the bidder themselves, and the venue shall be removed and restored at the request of the contractor when the contractor is completed or when the contractor’s application is completed. All the interception and drainage facilities related to photovoltaic power stations are responsible by the bidder.

5) Responsible for completing the project environmental protection projects and the implementation of soil and water (slope protection, slope protection, drainage, vegetation recovery and area greening, etc.), water conservation and environmental protection monitoring, safety facilities, professional disease prevention and protection facilities, and purification prevention and control facilities. The above tasks must meet the relevant requests and acceptance standards of the relevant vocational departments of the Bureau, and meet the acceptance standards of the National Dynamic Group to meet the acceptance standards of the investment.

6) The long-term leased land and permanent land acquisition in this project shall be handled by the bidder and shall bear the relevant prices. The bidder is responsible for the compensation of construction land (except the land acquisition red line, exceeding the planning standard), and is responsible for the relevant temporary land use process, and the bidder provides assistance.

7) The bidder jointly recruits the bidder to complete tasks such as quality supervision, online inspection, lightning protection inspection, fire protection inspection, file inspection, environmental protection inspection, and health safety inspection.

8) The bidder entrusts units with corresponding qualifications to conduct third-party functional inspections, and the bidder shall share the same, and the common price is included in the contract price.

9) The bidder shall pay the price of electricity and water for the construction and career before the transfer of engineering production and the bidder shall pay the price to the relevant units by himself.

10) The gas complete system adjustment includes but is not limited to gas special project adjustment, gas complete system adjustment, primary and secondary equipment t TC:

Categories: